Brands
Discover
Events
Newsletter
More

Follow Us

twitterfacebookinstagramyoutube
Youtstory

Brands

Resources

Stories

General

In-Depth

Announcement

Reports

News

Funding

Startup Sectors

Women in tech

Sportstech

Agritech

E-Commerce

Education

Lifestyle

Entertainment

Art & Culture

Travel & Leisure

Curtain Raiser

Wine and Food

YSTV

ADVERTISEMENT
Advertise with us

Solar pumps to be installed in 151 schools in Odisha's Koraput district

Solar pumps to be installed in 151 schools in Odisha's Koraput district

Monday August 31, 2015 , 2 min Read

In a bid to help students draw water from tubewells without manual operation, the administration in Koraput district has decided to introduce solar energy powered pumps in 151 residential schools for SC and ST students and 50 high schools. “The pumps will save time and energy required to bring out ground water. They can make a difference in schools which suffer from power shortage or those that have not been electrified”, officials said.


yourstory-tubewell

All identified schools have tubewells with hand pumps and it takes about 40 strokes to fill a bucket of water. However, the solar operated submersible pumps would help draw between 5,000 to 20,000 litres every day. It would operate automatically on solar power and store water in an overhead tank, they said.

“In the first phase, we have identified schools located in the most remote and Maoist hit areas of the district. Owing to remoteness, these schools are either not electrified or get erratic power supply for which the students face difficulty in getting water from the tubewells as motors can’t be used”, said Koraput District Collector Jaya Kumar V.

“Due to non availability of sufficient water in the hostels, the inmates go to nearby streams for a bath. This would be checked after installation of solar pumps”, the collector said. “The pump can operate for 7 to 8 hours between sunshine and sunset. After sunset or when solar power is not available,users can use the pump to draw water. The system has a backup and ensures uninterrupted water supply”, he said.

“Besides, the solar panel will last for 15 to 20 years nd both operations and maintenance costs are low. The administration has estimated a budget of Rs 3.20 crore for the project and had floated tender for it. Once the tender process is finalised, work for installation of pumps shall start”, he said.

Image Credit: Gettyimages


Read More:

Solar power to become cheaper in the next few years, report says

Time for sunshine, as Govt raises India’s solar target by five folds

“I have installed a solar panel for my 99 year old brother” – Dr A P J Abdul Kalam